You will have hopefully noticed the change of heading. Having spoken to the signwriter and returned home with a book of fonts, I have a play with Publisher and came up with the one above. We have yet to see what the signwriter thinks. Things have slowed down a little which I think has been due to the engineer being required elsewhere. Significant news is the launch date of 25 May (1999). I suspect that there will be quite a bit to finish once it is in the water but they are keen to get her into the water to get the trim right.

Looking forward into the bedroom, the full height wardrobe is on the right and the bed has a kick space below the cupboards.

This picture looks from the bed towards the vanity unit and wardrobe. This will have a mirror. the cables are for the 12v and  240v outlets

The cupboard top left is to have a glass paned door and the partitions have now been cut back and shaped with curved cut outs. The unit to the right will house the TV and radio.
The cooker has disappeared as the one that we had provided was illegal for use in new boats. A replacement has been ordered.

The new exterior views show the first coat of white gloss to the topsides while the blue is still in primer. The fold down roof structure has been propped into place. We are really pleased with the effect but unfortunately does not give enough headroom so is to be rebuilt with 3 inches more.